15:52 PM 10/23/2011

So I just got finished moving everythng in the workshop to one side. (Well almost everything.) Then I degreased the concrete using Castrol Super Clean and hosed it all off. Now I have to wait two days before I can begin laying tile.

I know I have ample tile to do the job due to the number of boxes (6+) and the size of the tiles (19" x 19") but I'm hoping to have a lot left over and be able to do at least part of the basement floor. We'll see once I finish the workshop since I'm only doing one car bay's worth of space.
Spacey Wacey not Timey Wimey... )
.

Profile

nimitzbrood: (Default)
Mike Hebel

Syndicate

RSS Atom

Most Popular Tags

Powered by Dreamwidth Studios

Style Credit

Expand Cut Tags

No cut tags